FPSO Cendor Phase 2

Project :   FPSO Cendor Phase 2
Fabrication, Installation and Testing of Hull/Vessel Piping Systems in Cargo
Tanks, Ballast Tanks, Pump Room, Fwd Pump Room and Main Deck

Rescue Works for Fabrication, Installation and Testing of Topside Piping Systems

Piping Integration Works between Vessel to Module and Module to Module
Piping Hook Up Works

Rescue Works for Mechanical – Equipment Installation of Topside Module

Modication and Conversion of Engine Room Steel and Outtting Works
Fabrication and Installation of Helideck Structure

Assistance in Commissioning
 
Owner :   MISC Berhad / Petrofac (M) Sdn Bhd
 
Period :   Dec 2011 to Current
 
Main Contractor :   Malaysia Marine & Heavy Engineering Sdn. Bhd.
 
Location :   MMHE Pasir Gudang, Johor.
 
Scope of Work :   The scope of refurbishment comprised of removal, renewal and reinstallation of pipe spools in cargo tanks, engine room, pump room and main deck, as specied by project consultant.

Marine conversion of cargo vessel to FPSO scope included new fabrication, installation and testing of piping systems c/w pipe supports and pipe racks; such as crude oil loading and ooading (cargo tanks and upper deck), crude oil washing, process and utility piping in cargo and ballast tank, FPT, pump room and main deck and integration of spools to Topside modules. Total combined volume of 85,000 dia-inch.

Fabrication and installation of hydraulic system piping and tubing with SS316L type with combined length of 12,000 metres.

The Scope of Topside Piping scope included new fabrication, installation and testing of piping systems c/w pipe supports for 12 units of modules with a total volume of 110,000 dia-inch piping which comprised of copper nickel, Duplex stainless steel, stainless steel, high and low temp and carbon steel.
  • C1 - Pipe Rack
  • C2 - Flare Tower
  • P1 - E House
  • P2 - Power Generation
  • P4 - Riser Balcony
  • P5 - Crude Stabilisation Unit and Production of Water Treatment
  • P6 - Flare Knockout
  • S2 - Custody Transferring Skid
  • S3 - Seawater and Chemical Injection
  • S5 - Water Injection System
  • S7 - Gas Lift Compression
  • S8 - Fuel Gas System
FPSO Cendor Phase 2
FPSO Cendor Phase 2
FPSO Cendor Phase 2
FPSO Cendor Phase 2